The aluminum alloy roofing system made by King Machinery Manufacturing is an integrated system design for economic efficiency, helping you to achieve maximum safety and efficiency in any environment.
It is a complete system of weather protection, mainly made by bending, welding process, with high-altitude mesh structure, and cladding that protects construction sites and buildings and makes work both comfortable and safe in types of weather.
It is highly durable with long service life, easy to set up, can be pre-assembled at ground level and moved into place by crane.
Weather protection
Roof Systems are a robust temporary weather protection solution ideally suited to multiple applications in the residential, commercial, industrial, infrastructure and event sectors.
The roof system provides a quick, economical and easy to assemble solution to meet a diverse range of weather protection applications. The system is also modern and visually appealing, making it a great option for applications where site aesthetics are an important factor.
Easier and safer to assemble
Roof System's lightweight aluminium construction makes it easy to handle and significantly reduces assembly and disassembly times when compared to traditional protection methods. It also offers a safer means of installing roof sheets by removing the need to work on the top of the structure.
Cost effective
The flexibility of the system enables you to create protective roof structures, or combine it with sheet wall components to expand the system into a fully enclosed hall.
Roof System remains very cost effective, and the system's modular design, with just a small number of truss and bracing components, offers significant savings in build time and labour costs.
Roof System Components (Light)
KMM's Business Scope & Processing |
Product Name |
Aluminum Welding |
Material |
Alu1100/3003/5052/6063/6061, SUS304,SUS316 |
Thickness |
0.5-20mm |
Process Name |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
Drawing |
Provide by customer, or design according to the sample |
Drawing format |
AutoCAD, SOLIDWORK, CAXA, UG, CAD, CAM, CAE, STP, IGES |
Mould |
Design and produce by ourself |
Drawing time |
3 days |
Sample time |
7-10 days |
Lead time |
30 days |